Energy conduit cold roof PVC
NEW
Feed-through of cables/lines through the roof package.
NEW
Feed-through of cables/lines through the roof package.
Attention: The processing instructions of the roofing membrane manufacturers must be observed; Materials and material compounds used may be subject to changes
The FPO/PP and PVC variants, as well as the BIT variants with a factory-laminated bitumen connection sleeve, ensure an optimal connection to bitumen roofing membranes. The base unit is made of weather-stable plastic with the following properties: UV-stabilised and resistant to thermal degradation and oxidative ageing. Cold impact resistant, ensuring optimal performance in challenging climatic conditions.
Align the vent with the intended substrate and secure it in position at four points using the holes in the edge of the mounting flange. Weld the waterproofing membrane onto the horizontal flange area professionally, according to the roofing membrane manufacturer‘s processing specifications. Feed the cables up through the vent and thread them through the gooseneck bend. Position the gooseneck bend precisely on the lower part of the vent and press down firmly all around. Finally, check that the gooseneck bend is secure in position.
| Material | Technical details 2 | Height |
|---|---|---|
| PVC similar to RAL 7035, Light Grey |
D 75 mm (DN 70) | 354 mm 1 |
| D 110 mm (DN 100) | ||
| D 125 mm (DN 125) | ||
| D 160 mm (DN 150) |
1 Special lengths available on request
2 Attention: Please note that the visual representation may differ from the illustration
| H | 450 mm | 495 mm | 528 mm | 557 mm |
| D1 (D Pipe) |
D 75 mm (DN 70) |
D 110 mm (DN 100) |
D 125 mm (DN125) |
D 160 mm (DN150) |
| D2 (D Plate) |
300 mm | 380 mm | 380 mm | 380 mm |
Special lengths available on request.
Attention: Please note that the visual representation may differ from the illustration.
Delivery in box, PU 1 piece
Do you have any questions or require a customised version of this product? Talk to our team of experts! We’ll discuss the available options with you to see how we can help!
Attention: The processing instructions of the roofing membrane manufacturers must be observed; Materials and material compounds used may be subject to changes
The FPO/PP and PVC variants, as well as the BIT variants with a factory-laminated bitumen connection sleeve, ensure an optimal connection to bitumen roofing membranes. The base unit is made of weather-stable plastic with the following properties: UV-stabilised and resistant to thermal degradation and oxidative ageing. Cold impact resistant, ensuring optimal performance in challenging climatic conditions.
Align the vent with the intended substrate and secure it in position at four points using the holes in the edge of the mounting flange. Weld the waterproofing membrane onto the horizontal flange area professionally, according to the roofing membrane manufacturer‘s processing specifications. Feed the cables up through the vent and thread them through the gooseneck bend. Position the gooseneck bend precisely on the lower part of the vent and press down firmly all around. Finally, check that the gooseneck bend is secure in position.
| Material | Technical details 2 | Height |
|---|---|---|
| PVC similar to RAL 7035, Light Grey |
D 75 mm (DN 70) | 354 mm 1 |
| D 110 mm (DN 100) | ||
| D 125 mm (DN 125) | ||
| D 160 mm (DN 150) |
1 Special lengths available on request
2 Attention: Please note that the visual representation may differ from the illustration
| H | 450 mm | 495 mm | 528 mm | 557 mm |
| D1 (D Pipe) |
D 75 mm (DN 70) |
D 110 mm (DN 100) |
D 125 mm (DN125) |
D 160 mm (DN150) |
| D2 (D Plate) |
300 mm | 380 mm | 380 mm | 380 mm |
Special lengths available on request.
Attention: Please note that the visual representation may differ from the illustration.
Delivery in box, PU 1 piece
Do you have any questions or require a customised version of this product? Talk to our team of experts! We’ll discuss the available options with you to see how we can help!